Redevelopment of Ernakulam Town Railway Station
Project Overview
Redevelopment of Ernakulam Town Railway Station including the construction of a West Side Terminal Building, MLCP, Memorial Building, and Museum & Cafeteria Building.
Scope of Work
- ✓ West Side Terminal Building
- ✓ MLCP (Multi-Level Car Parking)
- ✓ Memorial Building
- ✓ Museum & Cafeteria Building
- ✓ Road work
- ✓ Boundary Wall
Project Stats
Ernakulam Town is one of Kochi’s two main railway stations and stays in service throughout its redevelopment. Felicet’s scope covers a new West Side Terminal Building, multi-level car parking, a memorial building, and a museum and cafeteria building, together with the road works and boundary wall that tie them into the existing station.
Buildings in scope
The West Side Terminal Building gives the station a second entrance and concourse, which changes how passengers reach the platforms and how vehicles circulate around the site. The multi-level car park replaces surface parking with structured parking, freeing ground area and separating drop-off traffic from through traffic.
Alongside those, the memorial building and the museum and cafeteria building are civic buildings rather than operational railway ones, with finishes and public access requirements that differ from the terminal work. Road works and the boundary wall complete the site, and they are usually what determines whether the new buildings actually function as intended once they open.
Building beside a station that stays open
Trains run and passengers arrive throughout the programme. That single fact shapes everything: construction traffic is segregated from passenger movement, noisy and dusty operations are confined to agreed windows, and each area is handed back usable at the end of a possession whether or not the work in it is finished.
The sequence is therefore driven by access as much as by engineering. Work packages are staged so that a working entrance, a working forecourt and a working platform approach exist at every point in the programme — which is a harder constraint than it sounds, and is the main reason station projects take the shape they do.
Status
The project is ongoing. Progress is reported against the construction programme rather than against a target opening date, and the buildings are commissioned and handed over as they complete rather than all at once.