Loading sequence 0%

Our Businesses

NETWORK&DATACENTER

Cabling · Enterprise Networks · Cooling · Tier III Redundancy

Capabilities

ConsolidatedServices

🔌

Structured Cabling

Cat6A/6/5e, high-performance fibre optic backbone, and custom rack cable management.

🌐

Network Design

LAN/WAN switching, core routing, VLAN segmentation, and software-defined networking.

📡

Wireless Systems

Enterprise-grade Wi-Fi 6/6E solutions, RF surveys, and predictive signal planning.

📹

IP Surveillance

AI-driven high-resolution cameras, network recorders, and intelligent central monitoring.

⚡

Power Redundancy

UPS setups, dual PDUs, static transfer switches, and N+1 generator synchronization.

❄️

Precision Cooling

CRAC/CRAH units, hot/cold aisle containment, and liquid cooling for high-density servers.

🔒

Physical Security

Biometric multi-factor access control, mantraps, and 24/7 environment logging.

📞

Unified Comms

Business VoIP routing, multi-site video conferencing integration, and cloud collaboration.

Data Center Standards

Uptime Tier Compliance

Tier I
99.67%
Uptime SLA

Single path for power and cooling, no redundancy

Tier II
99.74%
Uptime SLA

Single path for power and cooling, includes redundant components

Felicet Standard
Tier III
99.98%
Uptime SLA

Multiple power and cooling paths, concurrently maintainable (N+1)

Tier IV
99.99%
Uptime SLA

Fully redundant paths, fault tolerant, dual-powered

12,000+Network Ports Active
1.38Average PUE Rating
99.98%Guaranteed Uptime
Tier IIIDesign Compliance
Infrastructure Partners
Cisco
HPE
Dell
Aruba
Ubiquiti
Hikvision
Fortinet
Juniper
Uptime Institute
Panduit
Featured Project

Hyperscale&EnterpriseBuild

Data Center & Network Project
12,000+Structured Ports
1.38Design PUE
99.98%Power SLA
280Ksq. ft. Campus
Delivery Lifecycle

Server-RackWorkflowTimeline

U5
NODE 01 // ONLINE10.0.128.20

Audit & Plan

Load calculations, RF spectrum analysis, rack space allocation, and site layout reviews.

U4
NODE 02 // ONLINE10.0.128.21

Design & Engineering

Drafting network topologies, single-line diagrams, cooling calculations, and cabling routes.

U3
NODE 03 // ONLINE10.0.128.22

Procurement

Sourcing tier-1 active components, rack cabinets, custom optical fiber, and failover equipment.

U2
NODE 04 // ONLINE10.0.128.23

Integration

Fiber splicing, precision cooling installation, core routing configurations, and power failover testing.

U1
NODE 05 // ONLINE10.0.128.24

Certification

OTDR fiber certification, environmental heat mapping, uptime load testing, and TIA-942 compliance reports.

Network infrastructure installation across India — fibre and copper cabling, enterprise wireless, surveillance and security systems, and the data centre space they terminate in. Felicet designs, installs, tests and documents the network as a single package, so there is one party accountable when something does not work.

From the backbone to the access point

A campus network is a chain of dependencies: fibre between buildings, copper to the desk, switching between them, wireless over the top, and power and cooling underneath all of it. Most performance problems that get escalated as "the network is slow" turn out to live at one specific link in that chain — which is why we install and document the whole chain rather than a convenient part of it.

Scope typically includes:

  • Fibre optic backbone between buildings, floors and distribution frames
  • Copper horizontal cabling to workstations, access points and devices
  • Core and edge switching, routing, and network segmentation
  • Enterprise wireless design, including RF survey and heat mapping
  • IP surveillance, access control and security systems
  • Containment, pathways, racks and labelling to a documented scheme

Why testing and labelling matter more than they sound

Two deliverables decide what a network costs to own: the test results and the labelling scheme. Test results prove the installation met its category at handover, which settles the argument about whether a later fault is cabling or equipment. Labelling decides whether tracing a port takes two minutes or an afternoon.

We hand over both, along with as-built documentation of pathways and terminations. It adds a little to installation and removes a great deal from the next five years of support.

Common questions

Can you install across multiple buildings on one site?
Yes. Inter-building fibre, external pathways and distribution frames are routine for us, including trenching and duct work where the route is not already there. Each building is commissioned as it completes rather than waiting for the whole campus.
Do you do RF surveys before installing wireless?
Yes, both before and after. A predictive survey sets access point placement from the building plan and materials; a post-installation survey confirms real coverage. Skipping either is how sites end up with dead zones that no amount of extra hardware fixes.
Do you handle CCTV and access control too?
Yes. Surveillance, access control and the network they run on share cabling, switching and power, so splitting them between contractors mostly creates interfaces to argue over. We install them together.
What documentation do we receive at handover?
Certified test results for every link, OTDR traces for fibre, as-built drawings of pathways and terminations, the labelling schedule, and the configuration of the hardware installed. Everything needed to support the network without calling us.

Design Your Next-Gen Network

From structured office cabling to fault-tolerant Tier III server rooms, our engineering team is ready to consult.

Start a Consultation →