Redevelopment of Kozhikode Railway Station
← Back to Our WorkConstruction

Redevelopment of Kozhikode Railway Station

πŸ“ Kozhikode, Kerala, South IndiaπŸ“… 2026

Project Overview

Major redevelopment of Kozhikode Railway Station with new East and West Terminal buildings, health units, and residential blocks.

Scope of Work

  • βœ“ East Terminal building
  • βœ“ West Terminal building
  • βœ“ MLCP - II (Multi-Level Car Parking)
  • βœ“ Railway Health Unit
  • βœ“ Type II residential blocks (3)
  • βœ“ Type III residential block
Start a Similar Project β†’

Project Stats

StatusOngoing

The redevelopment of Kozhikode Railway Station is the largest of our current station projects by building count: East and West Terminal buildings, a second multi-level car park, a Railway Health Unit, and several residential blocks. Felicet is delivering it while the station continues to operate.

Two terminals, one station

Building terminal structures on both the east and west sides turns a single-entrance station into one approachable from either side of the tracks. For passengers that is a shorter journey to the platform; for the project it means two construction fronts, two sets of site access, and a programme that has to keep both honest at once.

The Railway Health Unit and the residential blocks β€” Type II and Type III β€” are a different kind of building altogether: occupied, serviced, and governed by their own standards for layout and amenities. They are built on the same site, under the same constraints, but they do not share the terminal buildings’ structure or finishes, so they run as separate packages within the programme.

Multi-level car parking

MLCP-II adds structured parking to the station. Car parks look simple and rarely are: ramp geometry, headroom, drainage, ventilation and the junction with public roads all have to resolve together, and all of them are fixed early in the design.

Its position also decides how traffic reaches the terminals, so it is coordinated with the road layout rather than designed in isolation.

Status

The project is ongoing, with the work packages sequenced around station operations and handed over as each completes.