Tier III Design ยท Colocation ยท Cooling ยท Power Redundancy
Our Capabilities
Design & Build
Turnkey data center construction from concept to commissioning โ Tier II to Tier IV.
Power Systems
UPS, generator sets, PDUs, static switches, and N+1/2N redundancy configurations.
Cooling Systems
CRAC/CRAH, precision cooling, aisle containment, and liquid cooling solutions.
Physical Security
Biometric access, CCTV, mantraps, and 24/7 security monitoring systems.
Tier Compliance
Non-redundant, basic cooling
Partial redundancy, UPS
N+1, concurrent maintainability
Fully redundant, fault tolerant
Standards & Certifications
Data centre design, build and installation โ power, cooling, containment, cabling, fire suppression, security and monitoring, delivered as a commissioned facility rather than a room full of equipment. Felicet builds server rooms and data centres across India, from single-room enterprise facilities to Tier III-class builds.
What gets designed before anything is installed
A data centre is a set of trade-offs fixed early and expensive to revisit: how much redundancy the business actually needs, what density the racks will reach, how cooling will keep up when they do, and how the facility grows without being rebuilt. We settle those first, in writing, because every later decision inherits them.
Delivery then covers the full stack:
- Power โ UPS, generators, PDUs, static transfer switches, and N+1 or 2N topologies
- Cooling โ CRAC and CRAH units, precision cooling, hot and cold aisle containment
- White space โ raised flooring, racks, containment, structured cabling and pathways
- Fire detection and suppression, designed for an occupied electrical environment
- Physical security โ biometric access, CCTV, mantraps and monitoring
- DCIM and environmental monitoring, so capacity and conditions are visible rather than assumed
Designed against the standards, commissioned against the design
We design to the recognised references for the discipline โ TIA-942 for infrastructure, ASHRAE for thermal conditions, and Uptime Institute tier topology as the framework for redundancy. Designing against a standard and being certified to it are different things, and we are explicit about which applies on any given project.
Commissioning is where that design is proved: load bank testing, failure simulation, and witnessed handover of every protective system, before a single production workload lands in the room.
Common questions
- What tier should our data centre be?
- It depends on what an hour of downtime costs you, not on what sounds impressive. Higher tiers mean concurrent maintainability and fault tolerance, and they cost materially more in power and cooling topology. We size redundancy to the business case and show what each step up actually buys.
- Can you upgrade an existing server room?
- Yes, and most enquiries are exactly this: a room that has outgrown its cooling or power. We assess current load, thermal behaviour and single points of failure, then stage the upgrade so the room keeps running โ which usually dictates the sequence more than cost does.
- How do you handle high-density racks?
- With containment and airflow management first, since most "cooling problems" are really air management problems. Where density genuinely exceeds what air can carry, in-row cooling or liquid cooling is designed in from the start rather than retrofitted.
- Do you provide ongoing maintenance?
- Maintenance of the facility infrastructure โ power, cooling and monitoring systems โ can be scoped with the build. Tell us whether you want a full service agreement or callout support and we will price it alongside the project.
Plan Your Data Center
From edge deployments to hyperscale facilities, our engineers will design the perfect solution.
Get a Consultation โ